Little Red Gets Rebuilt

After weeks of rain, our good weather finally arrived in June, and we were hard at work rebuilding our boat. 
With my parents here over that time period to help with watching Falcon, both Jason and I were able to put in the much-needed time to get "Little Red" ready for the water once again. 
With my dad here to help with replacing the axle on the boat trailer, cutting the fibreglass, and as a third set of hands during the longer days of fibreglassing, things went smoothly. 
During the first week of July, Little Red got her coats of paint, the controls and steering wheel were re-installed, brand new seats were put in, and the outboard motor was remounted. 
Then, finally, around the middle of July we got to launch her once again, and Little Red spent the rest of the summer up on Link Lake. 





Comments

  1. Your abilities never cease to amaze me, its so incredibly satisfying to see all you accomplish together. It's such a beautiful life you've built together.❤️

    ReplyDelete
  2. Little red looks amazing! You have always been able to get in there and get the job done! Beautiful!

    ReplyDelete
  3. She's looking very red and spiffy!

    ReplyDelete

Post a Comment

Popular posts from this blog

Finally Back to the Blog

A Fantastic Birthday

First Things First