Finishing the Paint Job
March 22nd and 23rd (Sunday and Monday)
On Sunday we painted the kitchen area of the suite. We used a third colour for the kitchen called “Sandy Beach”, and Jason and I both liked it more than the pinkish-white colour that we had used for the walls in the rest of the suite. Unfortunately there was only two gallons of the “Sandy Beach”, so we definitely did not have enough to use in the other rooms. As it was, we used a full gallon for the first coat in the kitchen, doing inside all of the cupboards and drawers, and most of the second gallon for the second coat.
On Monday we painted all of the doorframes, window frames, and baseboards with the blue colour, and now the place looks pretty and new. It is amazing to see the difference of the whole suite from when we first started. Seeing projects like this through to the end is always rewarding.
Our repair of the dryer vent hole, and also of the many cracks in the walls and ceiling turned out well. I think it would be next to impossible to figure out where the dryer vent hole used to be if you had not seen where it was before we fixed it.
On Monday we painted all of the doorframes, window frames, and baseboards with the blue colour, and now the place looks pretty and new. It is amazing to see the difference of the whole suite from when we first started. Seeing projects like this through to the end is always rewarding.
Our repair of the dryer vent hole, and also of the many cracks in the walls and ceiling turned out well. I think it would be next to impossible to figure out where the dryer vent hole used to be if you had not seen where it was before we fixed it.